MONORAIL EXTENSION PROJECT
⚲ Washington, USA
Delay Analysis Services
Contractor
2012
Construction of a 37km extension of an existing metrorail system. During construction, a cast segment for one of the railway portions of the project was damaged and had to be recast. By the time the insured returned to the pre-incident position, the project was delayed by 13 days as a result of the incident.
Engaged to analyse the full extent of the delay and assess the validity of the mitigation worksand the associated costs.